Kingsley Square
LOCATION: 693 Davis Drive, Newmarket
DEVELOPER: Briarwood Development Group
CONSTRUCTION MANAGER: GCL Builds
PROJECT OVER VIEW: Designed by Kohn Architects, these two 15-storey towers located in the heart of Newmarket, have 2 levels of underground parking and an extensive foundation design. With challenging soil conditions and nearly at grade water table, DyMont Engineering Inc. has provided top notch all around permanent water cutoff shoring wall design support with 2 levels of tiebacks. This design-build project, included extensive collaboration with the consultant team and intensive input from Iron Shoring and Roni Group, to implement the shoring design with ease.
- In Construction
- Contractor | Iron Shoring Inc.